Overall survey
Some city electric power bureau correspondence department
manages equipment, resources quantity extremely many: The
optical cable has amounted to above 1,200 kilometers, the management
correspondence stand has reached 57, the information stand has reached
58, the related equipment surpasses more than 600 (set), manages fixed
asset resultant above 60 million Renminbi. Facing network which
expands day by day, only depends on the tradition manual management to
be unable to adapt the present scale, extremely needs one kind
comprehensively, the sequenced resource management system carries on
the system the management.
From 2004, in existing matches in the net GIS platform, the THP
correspondence network resource management system starts to construct,
up to at the beginning of 2005, has already completed to the entire
correspondence network modelling and the data input work. In
2005 comprehensively enters the practical movement process, and passed
the provincial level appraisal in 2006 March.
Application result
1. For the network planning and the capital construction,
the transformation project provide the science the basis
The system the communication facility space resource management,
the logic resource management and the GIS map union, achieved
comprehensive, sequenced correspondence resource management goal,
caused the correspondence department to the entire local
communications network resources total quantity, the device class, the
geographic distribution and the communication facility performance
data had the extremely clear direct-viewing understanding,
comprehensively grasps at present communications system for the
correspondence plan department in the plan the complete picture,
established the overall situation network planning and the
determination capital construction, the transformation project
provides the reliable basis
2. Has realized correspondence teams and groups's material
sharing
Correspondence department equipment teams and groups often not
clear fiber optic cable line concrete trend, weak point position,
spare optical cable trend with condition; The line teams and
groups not clear optical cable each light core meets service, service
condition. The movement material preserves by each
correspondence teams and groups, the sharing material generally is the
old even expired material, the new change, the change is unable
promptly to share. Now promptly renews in GIS system all
materials, all signalman saw is same and the most newest correct
material.
3. Raised the network security movement level
The system can each communication circuit from the source end
the route which passes through to the goal end through 6 big
relational syntheses be a route chart, enables the movement department
direct-viewing to understand each electric circuit the concrete trend,
in involves the equipment to transform, the electric circuit replaces,
the breakdown platoon looks up and so on in the work, promptly makes
the correct judgement, reduces stops the service by mistake the
possibility, the convenient electric circuit stops the duplicate
service work, reduces the breakdown process time. Also can
establish some equipment, the line accident expected in the situation
affects the electric circuit, the definite accident plan, raises the
communications network safe operation level in advance
4. Is helpful repairs in a rush to the fast line fault
The communication link overhaul department may through this
system, the union light time domain reflector tdr survey, accurately
understand the optical cable breakdown geographical position
environment, the pole tower model, the serial number pole tower,
alternately surmounts and so on the special details, to repairs in a
rush the work the arrangement to bring very big convenient
5. Is helpful loses to the standard, matches, the
communication engineering coordination flow
This system may and matches the net with the electric
transmission to share data resources and so on the iron tower,
pipeline, when the transmission line movement control section to
shares the pole tower the transmission line carries on moves, the
transformation, can accurately understand the correlation
communication link the special details, promptly link up with the
correspondence department, convenient both sides carry on when the
transmission line move, the transformation adjusting work.
|