> Fuji trade (Asia) limited company Beijing office
Sheng Lirong Li Qinghua Beijing East Aisa water supply plant power Guang Yi Key word: Frequency conversion water supply, PLC, PID 1. introductions The feedwater equipment technology renewal flourishes
more and more daily, but unceasingly consummates along with the
correlation electrical equipment technology advancement. Along
with Fuji new generation of small PLC-SPB going on the market, obtains
the further development in the frequency conversion water supply
technological transformations, realized the control function to be
stronger, price lower advanced version control cabinet. 2. systems introductions This system for as soon as tows three patterns, the idea
has 30 PLC one, 2.2KW frequency changer one, water pump three, related
low pressure electric appliance one batch, because its main core
component completely selects the Fuji electrical machinery high
quality labor to control the product, also may be called the Fuji
constant pressure frequency conversion water supply control cabinet
Diagram as follows: 3. functions introductions This kind of frequency conversion cabinet is one kind of
low cost as soon as tows three control modes, its process is 1 pumps
the velocity modulation movement to the full load when still reaches
in arrives the hypothesis pressure, PLC pumps the current movement
transforms into the labor frequency, again softly starts 2 to pump,
starts to modulate velocity the direct link hypothesis pressure value,
like still could not answer the purpose then pumped 2 also transfers
the labor frequency movement, after 3 pumped the soft start to put the
velocity modulation operation, achieved the hypothesis pressure value,
reduced pumped when according to 3, 2, 1 pumps the smooth execution.
So circulates the reciprocation, the realization closed loop
regulating control constant pressure water supply. Then saves
the energy, also may achieve the economy durably, may realize the not
interrupted water supply or automatic fixed time supplies water,
equipment movement reasonable, reliability high, disposition nimble,
the operation maintenance is simple. 4. systems principle of work This system work flow is: Will transport passes on
the pressure gauge to supply water in the pipe network dynamic
pressure signal direct input to the frequency changer simulation
quantity input 端子, took the frequency conversion closed loop PID
control the feedback quantity, the frequency conversion velometer
demand signal will assign by control 端子 X1-X4, because the
frequency conversion water supply will not be high to the frequency
precision request, 4 端子 might compose 16 levels of frequencies to
assign the change. X1 - X4 controls the combination by PLC four
outputs, simultaneously the PLC output spot may control the labor
frequency/frequency conversion the cut. Its most important is
uses the frequency changer FMP 端子, the output and the frequency
become the proportion the pulse string, again inputs to SPB-PLC
high-speed counting 端子, calculates the frequency changer the
actual output frequency, compares after the PLC operation, realizes
the nature cut which each pumps, truly achieves the constant pressure
water supply the goal. When fire movement, presses down the fire
prevention 按纽, the execution corresponding PLC procedure, all
water pumps cut into the labor frequency movement by, guarantees the
fire water used pressure. 5. equipment shapings 1. frequency changers: Selects the Japanese
original installation Fuji electrical machinery FVR2.2E11S-4JE
frequency changer. This model low noise, the torque big, the
volume small, the function is strong, brings the PID function, may in
each kind of situation use, be the low power high performance
frequency changer first choice. 2. programmable forewords controllers: Selects the Fuji
electrical machinery most newly to promote SPB series small PLC:
NWOP30R-31 (16 enters /14), this machine characteristic as
follows: 1. volumes exquisite, the function formidable, the processing
speed quick, the variety is complete (20, 30, 40, 60 main engines, 16,
32 expansions); 2. direct belts expand, do not need to meet the power source in
addition, most greatly may reach 124; 3. has from lifts the bolt 端子, the wiring is convenient,
does not fall the bolt; 4. has outside each kind to meet the unit, like the simulation
quantity (4 enters, 2, 3 enter /1), RS-232C, RS-485 communication
unit, AS-I main line unit; 5. high-speeds counting may reach 100KHZ 6. software functions formidable: (1) has each kind of 32 operational command; (2) 40, 60 belts internal clock; (3) has the floating point calculation function, and
corresponding trigonometrical function operation function; (4) has pulse control function and so on the PWM; (5) has the multistage pitch to retain one's hold the function; (6) has the matrix, PID, function and so on digital switch
read-in; 3. low pressure electric appliances: (1) air switch: Fuji electrical machinery EA33B/15A. (2) contact device: Fuji electrical machinery SC-E03
nominal current 12A. Thermal relay: The Fuji electrical machinery TK-E02/9-13A
belt breaks protects. 6. concluding remark This frequency conversion constant pressure water supply
control cabinet may widely apply to the city and countryside each kind
of type running water water supply system, high-rise construction
water supply, domestic water and fire water supply industrial
production operating mode closed loop water used constant pressure
control. |