First, system outlineSome natural gas branch station controls the
system interrupts the valve chamber including two crafts stations
factory and five lines. After a station will complete realizes
the natural gas to filter, the measurement and the clear tube
transmission function; After 末站 will complete realizes the
natural gas to filter, the measurement, the accent presses with the
clear tube receive function. A station, 末站 the establishment
station controls the system the management to be possible to realize
nobody operation and some person of duties level; Will interrupt
the valve chamber to realize GPRS on long-distance to pass on
condition signal and so on the current capacity, pressure separately
arrives a station with 末站. Second, technical difficultyThe test point is dispersible. The line
controls the system subordinate's station to control. The entire
brake pipe long amounts to several hundred kilometers, must along the
route distribute the RTU gathering data. The natural environment is bad. The brake pipe along
the route temperature undulates in a big way, summer, the winter
temperature difference is big. Communication way diversification. The station
controls the interior to use RS232, RS485, RJ45, the long-distance
transmission uses GPRS. The system security is high. Loses the gas to belong
to the special security profession, is extremely high to the SCADA
system request. Third, solutionECHO the SCADA 5,000 systems are the true
distributional data acquisition and the supervisory system. On
the system each computer all is an independent pitch point, each pitch
point independent execution system initial assignment duty. This
kind of structure merit is cannot off-line affect the entire network
because of a pitch point the movement. ECHO the SCADA 5,000
systems carry on the pitch point through the client/server pattern to
the pitch point communication, is in the network pitch point sharing
data. ECHO on SCADA 5,000 systems WAN moves again when is same,
in the long-distance access different position pitch point is similar
to on the visit local local area network the pitch point. The our company fully analyzes this project the concrete
demand and in the user characteristic foundation, according to this
project scene craft actual situation, considered home, outside
automated scene control station in performance, price and post-sale
service aspect difference, 末站 field data gathering and the control
system select the our company RocK E40 the series PLC product;
Interrupts the valve chamber to select SuperE-M series RTU. 1st, use productROCK E40. Peacefully controls the company
ROCK the E40 series module to have the technological advance, the
vitality strong characteristic. According to the scene actual
operating mode demand, may set up function formidable RTU, and has the
diverse connection function. Structure advanced, is easy to
expand. Has the full reliability design, strict performance
test, therefore the product can adapt each kind of bad environment. SuperE-M. This series RTU integration design,
structure simple, the integration rate is high. The system
module strictly according to the industry standard design, can work Yu
Gezhong the bad environment, has the extremely high industry
environment compatibility, all leaves the plant the product to pass
through the strict test and the examination. GPRS module. DTU is connected through the DB9-M
string mouth and the terminal, the interior supports GPRS each kind of
agreement, the user only needs through the simple AT order to be
allowed with ease to realize the terminal to carry on the GPRS
wireless data transmission function; Simultaneously DTU also
realized the Chinese and English short note code decoding process in
the interior, the user has not needed to understand the short news
arranged the decoding algorithm, the user only needs through the
simple AT order to be allowed to realize the short note transmission
function.
2nd, communication pattern 
3rd, system functionThe head stands PLC to lay aside in the control
room, connects the operator through the RJ45 mouth to stand, the
realization day fuel gas filters, the measurement and the clear tube
transmission function; 末站 PLC lays aside in the control
room, connects the operator through the RJ45 mouth to stand, the
realization day fuel gas filters, the measurement, the accent presses
with the clear tube receive function; Long-distance interrupts
valve chamber RTU on to pass on condition signal and so on the current
capacity, pressure through GPRS separately arrives a station with
末站. 4th, application effectThrough this automated project implementation,
makes the user not only to enhance the pipeline to lose was mad the
potency, reduces the production cost, moreover also promoted the day
fuel gas corporate management flow standard, the management level
promotion, causes the policy-maker in to grasp the massive real-times
information resources in the foundation the science, thoroughly draws
up loses is mad the plan and the development decision-making, and
provides the foundation data for the business management information
system, forms the integrity with the enterprise information system
union the automation information management system. |