In recent years, coal mine production each kind of
accident continuously by each media exposure, this also direct
reflection current coal mine production has had many security
problems. Because the coal mine safety in production relates
people's life and property security, relational reform development and
social stability general situation, therefore does well the coal mine
safety in production work, can practically safeguard people's life and
property security, also has manifested the most broad masses' basic
interest. Along with monitoring configuration software in all the
various trades' and occupations' widespread application, the personnel
which many coal mines safety in production research institute, the
design institute and other is engaged in the coal mine safety in
production in order to enhance the project development the efficiency,
all hoped can directly use configuration software to carry on the coal
mine safety in production the management. But because the coal
profession has the particularity, for instance may the dynamic
additions and deletions substation, and so on the ultra time limit
directly carry on the control in the gas density and so on, also gave
monitoring configuration software to set the new request. These new requests include: * Software may when the movement dynamic increase or
deletion position number. Only has software when the movement
may the dynamic additions and deletions position number, only then be
able to satisfy in the coal production each gathering quantity dynamic
change. * Software may when the movement dynamic change actuation
connection. Only then, can change the gathering data along with
the demand change the order. * Software may when the movement the dynamic increase picture,
draws up each kind of chart Yuan, carries on each kind of animation
connection. Also only can display like this under equipment
changing in software by the graph way. * (For instance gas density) ultra limits after certain
quantities not only can carry on reports to the police, moreover also
may carry on the power failure control, the linkage control and
different controls and so on the control work. In order to meet the general coals safety in production
worker's need, the purple golden bridge company took the lead to
expand the monitoring configuration software function above, already
definitely could satisfy several requests. Under on introduces
purple golden bridge software by an application demonstration in the
coal mine safety in production aspect application. This system is composed by the under several parts: * Scene equipment Each kind of sensor, the control valve, the switch
and so on a measuring appliance, carries on the control and the
management by the substation. Their data compiles the
substation, issues to their control command by the substation. * Substation The control station, completes the control
function by the monolithic integrated circuit or PLC, according to
function difference, also divides primarily the substation and the
inferior substation two kinds. It can complete from following
measuring appliance gathers the data, and according to the limiting
value which beforehand establishes carries on reports to the police
with the power failure control, is one of main control mechanisms.
But it only can analyze under the control current substation an
all measuring appliance data, is unable to carry on the generalized
analysis to all measuring appliances, also is unable to complete the
different power failure function. * Server The computer server, the above moves purple golden
bridge monitoring configuration software, with under each substation
composition network. Purple golden bridge software through
network from under substation gathering data, thus can complete the
data centralism processing, also may carry on the synthesis to all
data the analysis. Purple golden bridge software the control
command which needs to carry on through the network transmits to under
each substation, again goes to a further control measuring appliance
by various substations. 
In purple golden bridge software movement below time can
complete the work: * Substation initialization Because each substation has not been allowed to
dispose contact surface, therefore the substation disposition work
completes by the server. Moves in the system, may increase, the
deletion in purple golden bridge software or change the substation.
Simultaneously also may revise each substation the disposition,
for instance each sensor type, measuring range, limiting value and so
on. After changed the substation disposition, purple golden
bridge software can through the network to the corresponding
substation transmission initialization order, the initialization
substation each establishment quantity. * The cycle gathers various substations the data In carries on the initialization after the
substation, purple golden bridge software can the periodic gathering
each substation data. These data including each sensor
simulation quantity and switch quantity, each control condition.
Moreover also has each substation the middle control condition,
in order to the server and the substation carry on control
synchronization, like this works as the hand-off control way, can the
correct smooth cut. * To scene equipment hand control Moves in the system, the operator may establishes
through the purple golden bridge software monitoring contact surface
certain control valves or the sensor as the hand control condition,
then to scene equipment transmission hand control order. The
control command first transmits through the network to each
substation, then carries on the concrete control by each substation to
a measuring appliance. * Procedure control The procedure control may complete with the
substation primary control logic same control function. When
system movement assigns when the purple golden bridge contact surface
certain sensors is at the procedure control condition, the server can
inform the corresponding substation, the substation to be able to cut
the corresponding control condition. This time, regarding is in
under the procedure control each sensor, the substation no longer
carries on any logical control, completely comes to this sensor
control command by purple golden bridge software through the network
to issue. The procedure control is one kind of backup control,
has the problem in the under substation control logic time, may cut
the procedure to control replaces the substation to carry on the
control. After the question is solved, gives once more the
domination transmission the corresponding substation. In the
usual situation, is normal when following substation control, should
by the under substation but not be purple golden bridge software
exercises the power failure control logic. Because the server
control needs to rely on the network the reliability, simultaneously
controls also can have the time delay which the network transmits. * Different controls Because each substation is unable to act according
to other substations the condition to carry on differently controls,
therefore the different control section must complete by purple golden
bridge software. So-called different controls, is acts according
to a substation certain quantities conditions to control other some
substations certain controllers. For instance after examines
ultra limits to a substation gas sensor data, not only needs
immediately to open this substation some equipment to increase
ventilates, but also must open the neighboring substation equipment
assists to reduce the gas density. * Reports to the police the prompt After purple golden bridge software discovered
surpasses the hypothesis from some substation gathering data the
limiting value, can produce corresponding reporting to the police, and
has reports to the police the sound prompt. In order to prompt
reminder operator's unusual occurrence. Purple Jin Qiaohuan has
provided the retrieval function which the history reports to the
police, may inquire wilfully one day-long to report to the police the
record. * The data compiles, the demonstration and the inquiry After various substations data gathering server,
purple golden bridge software may through the graph way, the animation
way demonstrate each substation the sensor condition. Also may
through the report form form each substation data centralism
demonstration and the analysis. Meanwhile gathers from the
substation to the data also may carry on the preserved history, like
this may comes the logarithm through the historical report form or the
historical tendency according to the change tendency carry on the
analysis. May know by the above introduction that, in this system
has the hand control, the procedure control, the different control and
the substation local as follows controls the altogether 4 kind of
controls, the substation to their processing way: * The hand control is most superior When some sensor is in the hand control, then not
corresponding other any controls, like this appears the breakdown when
the system control logic, may temporarily complete the overall system
through the hand control the control. * The procedure controls next When some sensor is in the procedure controls, the
sensor control condition by the procedure control and different
controls together decided, namely these two kind of controls so long
as has a need power failure, then carries on the power failure
control, otherwise carries on relegrams in reply the control. * Local controls inferiorly When some sensor is in the substation local
controls, the sensor control condition by local controls with
differently controls together decided, namely these two kind of
controls so long as has a need power failure, then carries on the
power failure control, otherwise carries on relegrams in reply the
control. Through the above introduction, we can see, the overall
system controls by three decided. In the usual situation, the
system local controls by the substation processes, when local controls
appears the breakdown may cut the procedure to control replaces, if
the procedure control also appeared the breakdown, then also may cut
the hand control to complete the control function. The next chart is time the overall system movement contact
surface, above the part is the function menu choice part, left side
the part is the further function choice menu, right flank the part is
the picture demonstration area. 
Under a brief introduction system movement each part: * The system lands 
When enters, needs to carry on lands, only had has input
the correct user name and the password, only then was allowed to enter
the system. * User management page 
If the current user has the enough jurisdiction, then
may enter the user management page, increases the new user or the
revision deletes the existing user. The user altogether has three kinds: (1)th, the highest system manager, he may not delete, also
only has him only then to be allowed to found or to revise other
system managers, he may enter any window, may carry on any operation. (2)th, the ordinary manager, he may not found or change
other any managers, but may found the operator user, he also may enter
any window. (3)th, the operator, he cannot found other any users, but
cannot enter the system disposition window, only can examine the
picture or the retrieval data. * Measuring point definition page 
It definition which including the substation definition,
the simulation quantity and the switch quantity definition, the
control channel definition as well as different controls. The
system can act according to the new definition the substation or the
channel founds the new position number, and simultaneously
automatically carries on the actuation connection for the new
foundation position number, the final system can the automatic use
recent information initialization corresponding substation.
After initialization substation, the system can automatically
gather this substation the data, and carries on reports to the police
with the control function. Moreover in order to facilitate the
channel the definition, the system provided has simulated the sensor
and the switch quantity sensor definition, like this when defined the
channel only needed to choose was correct already has defined the
sensor type, the system has been able automatically to take the
corresponding sensor to lack the province to suppose the value,
reduced the work load which the channel defined. * Trend analysis 
In this page may most examine 8 channels the data change
conditions, may put the different substation channel data tendency in
the same place carry on the comparison. May wilfully cut the
outset time, the time scope, also may the free enlargement curve
examine more details. * Reports to the police the inquiry 
In the current page may examine current occurs real-time
reports to the police, also may in the current page confirm already
occurred reporting to the police. Simultaneously also may examine wilfully a day-long
history reports to the police. Regarding reporting to the police
which retrieves, may print the careful analysis. * Real-time report form and historical report form 
May in the current page retrieval real-time data report
form, if on the chart will show, has reports to the police or the
power failure channel can demonstrate by the different color.
May examine the channel in the real-time data report form the
current value, also may examine each substation in the real-time data
report form the communication condition. Also may retrieve each kind of historical report form in
the current page, for instance 5 minutes simple points daily papers,
24 hours data report forms, as well as each kind of comprehensive
report form. * Picture edition page 
May Yuan and a complex chart Yuan kneading board comes
in this page through the left side Jan sketch map in the picture to
found the new chart Yuan. Double-clicks the corresponding chart
Yuan then to choose the connection the channel, the system can reflect
the corresponding channel by the animation form the data. For
instance ventilator revolving, air throttle changing color, the fluid
position fluctuation and the pipeline flow and so on. May
facilitate in this page carries on changes each chart Yuan position,
the edition size, work and so on revision writing. The current
page only has the system manager only then to be allowed to enter. * Real-time picture This picture demonstrated the picture edition page
produces picture, but may not carry on the edition, the operator user
may enter the current page. * Under the data sets 
May establish the substation in the current page certain
coefficients, may change some substation the control channel control
mode, may transmit the hand control order, also may complete
establishes tired measurement function and so on automatic clear zero. Through the above introduction, we may see, passes through the
purple golden bridge company's endeavor, purple golden bridge
monitoring configuration software already definitely was allowed to
satisfy the coal safety in production monitoring the need, used purple
golden bridge software to be able greatly to save the development the
time, reduced the development the work load. Believed through in
the coal safety in production aspect unceasing application, purple
golden bridge software will be able more perfect, to be more
convenient specialized. Article origin: Http://www.realinfo.com.cn/anli/case32.htm |