Sewage treatment plant entire factory automatic control
system (1) system survey The Wuxi city reed village sewage treatment plant is the
Wuxi city discharge pipe 理处 subordinate's enterprise unit, is the
date processing sewage 200,000 tons automations, the information
degree very high entire processing sewage treatment plant. This factory control system stands, long-distance I/O by four
Simens S7-300 PLC stands (ET200) and center controls the room
constitution, each PLC stands with long-distance I/O stands all is
loaded with a Simens the TP system to take the field data
demonstration and the operation, the entire factory has the control
system (PLC to stand) connects a unified communication network through
a ring-like optical fiber industry ethernet, forms a complete entire
factory supervisory system network, simultaneously, in order to manage
conveniently, established has managed the local area network, and the
control system data will send out manages the local area network. Control system main constituent: * 1#PLC station: Feed pump room. Primary cognizance
feed pump room, 集水? craft, equipment parameter and so on cut
well gathering, control and transmission. * 2#PLC station: Air blower room. Primary cognizance
1#, 2#, 3#, the 4# biology pond, the air blower room, initially sink
the pond, 1# two sinks the pond, 2# two sinks the pond and so on the
craft, equipment parameter gathering, the control and the
transmission. * 3#PLC station: Putty processing. Primary
cognizance putty processing, old dehydrated engine room, methane
cabinet and so on * 4#PLC station: 5#, 6#, 7#, the 8# biology pond
and 3#, 4# two sink the pond data monitor and control; * Long-distance I/O station: Stand connected through
PROFIBUS and 4#PLC, is responsible to dehydrate the engine room craft,
equipment parameter gathering, the control and the transmission. * Center controls the room: (1) has through the industry ethernet entire factory control
system gathering the data dynamic demonstration to control in the
center on the room computer, and passable center has controlled the
room computer to carry on the adjustment to the entire factory craft
parameter and to carry on the operation to the equipment, and may the
logarithm according to carry on processing to form each kind of report
form, and memory history data. (2) transmits through the computer the field data to the
simulation screen on, vividly demonstrates the entire factory
production and the equipment movement situation. (3) will concern the data to bequeath the administrative unit
through the wireless way (environmental protection bureau and so on). (4) control network computer does is the data server, the
control system related data will issue the synthesis building through
the optical fiber (office building) the local area network, will
enable the authorized user in the office to be allowed to understand
the entire factory production and the equipment condition, the
privilege user also might carry on the operation in the office to the
entire factory equipment. (2) project characteristic 1. The system scale is big. The system has
four to disperse in different position Simens the PLC subsystem,
various subsystems are mutually independent, also constitutes an
organic network through the industry ethernet. 2. The network system is complex. Both has the
siemens the DP network, the MPI network, and has each PLC interstation
the optical fiber industry ethernet, but also has the control system
to the management system management system standard ethernet. 3. The equipment involves the breadth. Both has the
control system, and has the simulation screen, also has the ordinary
measuring appliance, also has the massive imports the analysis
measuring appliance. 4. Has realized the entire factory control network
unification and the control network and the management network organic
synthesis. (3)th, the project completes the situation The project throws transports in the recent year, the
control system movement stable is reliable, each target had achieved
the design request, obtained the party of the first part highly the
high praise, in the project overseeing project summary, the automatic
control system has obtained the high quality project by each specialty
most high score. |