> One, foreword Along with the science and technology development,
in the realization the low pressure distribution network automation
has become the electrical power system development the tendency.
Center the low pressure distribution network achievement loses
the electrical power distribution system last the link, its
realization automation degree with for the quality and the reliable
close correlation which uses electricity. Therefore, this 文特
makes the simple discussion to the center low pressure distribution
network automation necessity and its the realization plan. The distribution transformer is the electrical energy direct
apportionment for the low pressure user's power equipment, its
performance data is the entire distribution network foundation data
important constituent. Therefore, carries on the monitor to its
movement parameter and the condition is necessary. This article
discusses using GRPS took the means of communication, establish the
distribution transformer monitor system. In in the distribution transformer supervisory system
correspondence, may use the number to pass on the broadcasting
station, the GSM short news, the optical fiber turns on and so on the
way. The number passes on the broadcasting station the
superiority is besides an every year frequency expense, usually moves
does not need the extra cost; The shortcoming is the terrain,
the climate influence bigger, creates the system the reliability,
timeliness is worse, is unable to report on own initiative. The
GSM short news way may realize reports on own initiative; The
shortcoming is according to the strip charge, the operating cost high,
moreover is quite long in the holiday short message center mc server
busy time time delay. Optical fiber communications ofc stable
reliable, but the construction cost invests, the extension in a big
way is bad, the maintenance of equipment aspect is not convenient.
But the GPRS correspondence has avoided above the question. General grouping wireless service GPRS is one kind of recent
wireless data which develops on the existing GSM system passes on the
number service, the goal is provides high speed wireless IP or the
X.25 service to the mobile subscriber. The GPRS theory band
width may reach 171.2Kbit/s, the practical application band width
approximately in 40 ~ 100Kbit/s, provides the TCP/IP connection on
this channel, may use in application and so on INTERNET connection,
data transmission. GPRS uses the grouping exchange technology,
each user may simultaneously take many wireless channels, the
identical wireless channel may share by many users, resources by
effective use. GPRS permission user under end-to-end grouping
shift pattern transmission and receive data, but does not need to use
the electric circuit exchange pattern the network resources.
GPRS forever on-line, costs according to the current capacity,
thus has highly effective provided one kind highly effective, the low
cost wireless integrated data service. Specially is suitable for
interrupted, burst characteristics and is frequent, disperser, center
the small current capacity data transmission, also is suitable for the
occasionally great data quantity transmission. Second, system structure The distribution transformer synthesis management
system management system development goal is establishes a security to
be reliable, can provide each kind of high-level service, and the
promising application procedure execution and the implementation
provides a stronger function the open style platform and the movement
the system which composes in this platform many relatively independent
applications subsystem, becomes to conform to the electrical power
distribution system modern management requirement, distributional,
open style, the modulation, may expand distribution transformer
synthesis management system management system. The foundation
platform besides provides the basic hardware technology and the
operating system essence, but also provides such as foundation service
and so on database system, information transmission, man-machine
contact surface, real-time environment application procedure.
Respectively includes based on the foundation platform above
using the subsystem: The distribution transformer management,
the line damages the management, automatically copies the table, the
VQC function, the overtone data, buys the electric quantity
management, the data inquiry, automatic report form, graph and with
other systems connections and so on. Between these subsystems
(OSA) in the foundation realizes organic crosswise and the
longitudinal integration in the opening system structure, forms a
complete distribution transformer synthesis management information
system. The GPRS distribution transformer supervisory system network
overhead construction following chart shows, the system divides into
four parts, respectively is monitors the central master station, the
network proxy server, the GPRS data transmission terminal, monitors
the terminal device. The master station mainly completes the
man-machine alternately to work; Network proxy server primary
cognizance network data link establishment and data receiving and
dispatching transparent relay; The GPRS data transmission
terminal completes the information on to deliver with under sends;
Monitors the terminal device mainly to complete the digital
quantity and simulation quantity gathering. In this system the network proxy server may use INTELNET
male net connection and so on the ADSL, LAN, uses male net fixed IP or
the male net dynamic IP+DNS analysis service, considered stemming from
the security, the monitoring center master station in the local area
network, not straight is one after another on-line in INTERNET, is
responsible for the network data link establishment and the data
receiving and dispatching transparent relay through the network proxy
server. In after the GPRS data transmission terminal the electricity, it
can act according to establishes or is in advance the domain name
comes the initiative visit network proxy server in its internal IP
address, establishes the TCP/IP link through the proxy server and the
monitoring center. Monitoring center master station itself
maintains each terminal IP address and the ID number which turns on,
when the master station must to some monitoring terminal propose when
data request, it can found corresponding according to the IP address
and the ID number the terminal, under the order will send to this
terminal, after the terminal response sends through the GRPS data
transmission terminal the data the network proxy server port, through
the port insinuated will retransmit to the monitoring center master
station, namely has completed a reply -like communication flow. Above the way is (CMNET) realizes through Internet, such user's
realization cost comparison is low. If needs the redundant
reliable data transmission. China moved for this kind of
application provides has directly turned on the GPRS network the way.
The monitoring center master station directly turns on the GPRS
migration through the special line way 基站, and obtains a fixed IP
address. The test point data does not need the route to the
Internet network, test point DTU also uses fixed IP the address the
SIM card. Uses this way composition to have timeliness well to
the multi- spots network, the secure high characteristic, but
relatively turns on the expense to be higher.
Third, monitors the terminal This monitor system uses the power distribution
synthesis monitor meter is and matches according to the electric power
demand side management specification changes the load monitor
correlation standard design, the manufacture one kind of high tech
product. It uses the high accuracy numeral sampling processing
technology multi-purpose, the collection data acquisition, the
demonstration, the memory, the communication and so on to a body, and
passable backstage software has stored up the record the data by the
graph or the report form form demonstration, the printing and the
analysis. Its science and technology is in the lead, the
function formidable, the reliability is high, but widely applies to
the power distribution automated system monitor. Its main
function includes: Preliminary survey parameter: Three phase voltage, electric current, frequency, active power,
reactive power, power factor, four quadrants electrical energies,
ambient temperature and so on nine kinds, more than 30 parameters. Technical parameter Fixed technical parameter Rated voltage Un: 100V Nominal current In: 5A Nominal frequency Fn: 50Hz Survey accuracy Voltage/electric current/frequency: 0.2 level Power factor/active power/reactive power: 0.5
level Has the merit electric quantity/idle work electric
quantity: 1.0 levels In sets dodges saves the capacity Storage capacity: The 1024k byte, may realize
continuously on 84th to use electricity the data record (every 15
minutes records) Precision Voltage/electric current/frequency: 0.2 level Power factor/active power/reactive power: 0.5
level Has the merit electric quantity/idle work electric
quantity: 1.0 levels System parameter hypothesis Installment CT, PT change the ratio Data storage gap System clock LCD contrast gradient Has pressed the parameter Owes presses the parameter Has flowed the parameter Fourth, GPRS data transmission terminal The GPRS data transmission terminal realization
monitoring center master station with monitors the terminal the
communication. In this system uses ETPRO211Ai. Function
and characteristic as follows: A, function: 1. standards AT order contact surfaces, convenient programming; In 2. TCP/IP Internet inlays the agreement stack, with ease
interlocks; 3. RS232 connection way, simpler communication way; 4. passable strings mouths promotion procedure. B, performance: 1. uses the low power loss high performance CPU to make the
processor, 16 interior data bus, 128KBSRAM, 512KBFLASH, but high speed
processes the agreement and the mass datas; 2. supports entire is transparent and the frame form data
transmission; 3. supports TCP, IP, PPP, ICMP, UDP, TELNET, the HTTP agreement
stack; 4.1 conform to ISO7816-3IC card standard SIM 卡座, supports
conforms to GSM11.11 and GSM11.10, the standard SIM card; 5. simplifications connection designs, use the general 232
connections and simple AT order the interactive contact surface; 6. has supplied the more convenient power source connection
outside, then uses hangs the power source. Also may from string
together the mouth straight to receive the electricity; 7. entire machine power losses are smaller than 3W; 8. has consummated the false digit dialing which in the GPRS
network appears, automatically falls the line to open again,
long-distance awakens and so on the function; 9. supports long-distance controls and dynamic domain name
analysis; At the same time 10. has inserts the type system request in, may
provide sets at the type module (not to bring outer covering, passable
has inserted needle with to insert type direct system to be
connected). 11th, at the same time also has the software and hardware dually
看门? when DTU cannot the normal work, can the automatic power
failure replacement. Fifth, monitoring center master station Master station system most in surface layer for
operating system and system software. Second for system support
software level, including database system, electrical power system
model, data acquisition and transmission. The electrical power
system model mainly refers to the electrical power system equipment
object and the network analysis situs; The database system
divides the movement storehouse, the foundation storehouse, the
standard storehouse and the historical storehouse four parts;
The data acquisition and the transmission is acts according to
each kind of data from the different terminal each kind of
communication agreement to gather, but certainly does not carry on
processing, again for needs these data through the network
distribution the system. Third for the foundation application
level, the data which gathers passes through each kind of processing,
through the GUI contact surface demonstrated gives the user.
Fourth for the high-level application level, the data which it
produces mainly is supplies power the strength system further to
manage and the decision-making uses. Below on position software mainly completes the function: (1) the distribution transformer SCADA system transformer
movement monitoring, the transformer unusual situation monitoring, the
data analysis, processing and save the plate, the RTU parameter
establishment and the condition demonstration. Both can obtain
the distribution network movement the basic information, and provides
the very good foundation for the function expansion. (2) automatically copies the time which the table system basis
establishes automatically to transcribe the distribution transformer
and user's electricity number of degree. And has the electric
instrument exceptionally to report an emergency, the track copies the
table record and the operating record and so on the auxiliary
function. (3) the user buys the electric quantity management regarding the
prestige quite bad user, carries on through the system after it first
buys the electricity to supply power, and in the use electric quantity
achieved when certain proportions carries on the warning. (4) the line damages the management mainly is the area line
damages the management and the line line damages the management. (5) the switching equipment management mainly is equipment the
and so on distribution line and distribution transformer management. (6) the terminal wrong intelligence distinguishes the terminal
wrongly to divide into the communication to restore, the communication
severance (some terminal continuously three time summons not to
measure), the terminal wireless is wrong (one day continuously ten
time to summon not to measure), the wireless severance (continuously
has 30 terminals to summon not to measure). (7) shoulders the forecast through to calculate the master
station and the substation all areas total active power always adds
the value to come the preliminary forecast next stage the load
situation. (8) the capacitor throws cuts carries on the adjustment
according to the voltage and the power factor, when the adjustment the
consideration time factor and throws cuts the number of times.
In adjusts in the situation which malfunctions to be able the
distant place surveillance and the distant place control. If the
terminal throws without the adjustment cuts the function, after the
system can the distant place computation control the capacitor to
throw cuts. (9) the terminal operation may the distant place read takes or
establishes the terminal the parameter, like transformer 整定
parameter and so on. May establish the switch 合闸, switch
minute floodgate. May read takes or establishes the VQC
parameter. (10) meets the gift of gab with the marketing system database
conveniently to provide the data pool for the marketing system. (11) gathers the overtone data to be able to gather the user
through the system each 次谐?content. (12) the user steals the electricity management increase user
electric quantity and the power conversion for the electric quantity
comparison, through the establishment scale-up factor, carries on the
warning, for instance when the active power produces when the electric
quantity is motionless, then has the warning. Sixth, conclusion Realizes in our country the low pressure distribution
network automation, is improves the power supply quality, uses
electricity the reliability and raises the electric power enterprise
own level the need, GPRS took one recent communication method, applies
in the power distribution automation has very many merits, is a
comparison has the application prospect based on the GPRS
correspondence distribution transformer synthesis management system
management system the realization plan. |