>Introduces: The high-pressured shunted capacitor complete set
installment may divide into the bulk frame posture, the collection
according to the structure pattern is suitable and the semi-enclosed
type. Outside the arrangement way may divide into in the
arrangement and the room arranges. Its shaping and the
arrangement are is close connected with the transformer substation
general arrangement, simultaneously suitably considered the user the
movement custom, causes to choose the equipment fully to display its
characteristic, achieves the movement security, the investment economy
goal. Essential character:In outside the
bulk frame capacitor crowded capacitor room arranges arranges
The high-pressured shunted capacitor installs the
low pressure side which changes in the transformer substation host,
uses in carries on the idle work to the electrical power system to
compensate, enhances the electrical network power factor, reduces the
line to damage, the improvement voltage quality, fully displays the
generating plant the efficiency. The shunted capacitor installs
the complete set supply, has provided the convenience to the electric
power department, at present some 220 ~ 500 kV transformer substation
widely uses the large-scale power capacitor complete set installment,
since has turned oneself in transports, mostly safe stable, the
movement situation is good.
1 complete set capacitor installs structure pattern and
characteristic 1.1 bulk frames complete capacitors The bulk frame posture complete capacitor installment,
will be refers brings the iron casing the list Taiwan Telegraphic
Transmission vessel to lay aside according to the certain order on the
frame, the equipment all around will establish the railing. This
kind of product in domestic application scope broadest, each place has
the rich movement experience, and the movement effect is very good.
Complete set installment layout clear, the safe distance and the
insulation distance are bigger, because uses Shan Taiwai to melt the
silk protection, when the capacitor breaks down, outside melts the
silk to hint the sign to fall down, the movement personnel can very
quickly discover the breakdown capacitor and the prompt replacement,
reput the operation for the installment to strive for the time.
This edits is this pattern product deeply the main reason which
welcome. The bulk frame posture complete set installment shortcoming is
the area is bigger. In order to save 占地, may carry on the
multi- Taiwan Telegraphic Transmission vessel the high level
arrangement, the equipment lamination installment on the iron stand,
is convenient for the overhaul, about are not generally many to 3, the
level laying aside generally is 2 rows, guaranteed radiates convenient
which good and the movement patrols. South the Sushui 500 kV
transformer substation, guarantees 220 kV transformer substation, the
Tangshan small Mafang 110 kV transformer substation and so on uses is
outside the high level arrangement frame posture complete capacitor
installment. 1.2 volumes of suitable shunted capacitors The collection is suitable (called crowded) the shunted
capacitor by the internal capacitor unit, the frame, the box body and
the going beyond a line drive pipe is composed, its contour likes a
Taichung transformer, box in vivo fills the transformer oil, gets up
the insulation and the cooling effect. In the shunted capacitor uses the small part to add melts the
silk the protection. In the capacitor unit each small part
string has a melt silk, when some small part penetrates, other
complete parts to its electric discharge, cause the melt silk rapid
separation, the excision breakdown part. Because the capacity
only has the small change, therefore installed still can continue the
normal operation. In recent years the collection suitable complete set installment
product day by day diversified. If presses may divide into
single-phase and three-phase, 35 kV voltage rank generally for
three-phase, 110 kV voltage rank product for single-phase. May
divide into the entire seal and half seal type according to the
leak-proof quality, the entire seal structure is refers to the
installment box body outer covering the connection to use the welding
manner, but half seal structure box body crown uses the bolt and the
box body is fixed, the accident occurs when may turn on the box lid to
carry on the breakdown service in under the factory technical
personnel's assistance. 35 kV voltage rank according to may
divide into the entire insulation and half insulation product to the
place certainly fate; May divide into the fixed capacity, the
tap accent according to the capacity allows with the change-over
switch accent to allow 3 kind of forms, the accent to allow the type
product the appearance to be possible to avoid because the capacity
fixedly, is unable to give dual attention to the station construction
initial period and the final stage load difference is bigger, the
initial period installment does not throw disease. The collection suitable capacitor merit is the area small,
installs the maintenance to be convenient. Is suitable
compensates to the transformer substation outdoors centralism,
specially is suitable for the electrical network transformation
project. East for example guarantees (grandson village) 220 kV
five issues to rebuild the project, because the host changes the
increase, causes the idle work capacity demand the increase, the
design to consider uses the crowded product, has fully used this
equipment area small characteristic, in the existing space has
established 2 group of TBB in the station - 10 - 7,200 - 3W crowded
complete set installment, because protected from fire is away from
anxiously between, changed in the installment and the host has
established the firewall. The collection suitable capacitor also has the shortcoming which
it is unable to avoid: If in the movement, the equipment once
appears the breakdown, breakdown is not easy to search, also must
carry on to the equipment hangs the core and insulating oil
purification processing, but the user often does not have voluntarily
to maintain repair the condition, only can with the factory relation,
bring inconveniently to the movement. This also is many users is
not willing to use this pattern product the main reason. The collection suitable capacitor also has many years movement
experience in the electrical network, compensates a capacity smaller
middle and small scale transformer substation in particular in some
idle works Center, the movement situation is very satisfying.
The Shijiazhuang electrical industries bureau uses the
collection suitable capacitor installment to be more, my courtyard
design Xinji 220 kV transformer substation second phased project, the
Hengshui 220 kV transformer substation technological transformation
project, the Baoding 110kV industry stands the crowded capacitor
complete set installment which uses is outside arranges. 1.3 semi-enclosed types complete sets installment Semi-enclosed type capacitor quite Yu kuang the posture
installment neutrality will put the capacitor will lie on one's side
puts, and the charged partial seals in box in vivo, its outlook will
like at the same time the high-voltage switch cabinet. In
outside the installment the list Taiwan Telegraphic Transmission
vessel for lies on one's side puts, inserts the box body two sides,
the drive pipe to the drive pipe, the bottom of a chest faces.
The so-called half seal is refers the capacitor charged partial
seals in box in vivo, but the hard box partially exposes in box in
vitro. This product merit is the area small, the installment service is
convenient outside, may use melts the silk to do primarily protects,
also does not have to establish the oil storage facility. South
Hebei Province the net Handan electrical industries bureau uses this
equipment pattern many, "04" always falls by my courtyard design Dan
Hantan steel 220 kV presses the station, as well as the stone steel 35
kV transformer substation uses the semi-enclosed type complete set
installment which is in the room arranges, a Xinji 220 kV transformer
substation issue of project uses the semi-enclosed type complete set
installment which is outside arranges, since has turned oneself in
transports, the movement situation is good. The first years, some local movements semi-enclosed type
capacitor installments have the accident one after another, the
Shijiazhuang electrical industries bureau station transformer
substation have this pattern product when throws transports to have
the detonation accident. Its reason as follows: (1) as a result of the equipment half seal, causes the equipment
the radiation condition not to be good, is easy to occur congeals the
dew phenomenon. (2) because installs completely seals up by no means, the
humidity and the dust still might enter box in vivo, in the complete
set installment the list Taiwan Telegraphic Transmission vessel for
lies on one's side puts, end went beyond a line the drive pipe
vertical arrangement in a straight line, if the drive pipe porcelain
skirt accumulated the ash to be easy to have 闪络 the phenomenon. (3) lies the list Taiwan Telegraphic Transmission vessel which
puts, if the drive pipe leading-out terminal seals densely is not
firm, is easier to occur infiltrates the oil leak the phenomenon. (4) is opposite to the equipment which standing puts, oil mass
how many has a more tremendous influence to the internal small part. Thus it can be seen, the semi-enclosed type complete set
installment product quality and the structure also wait for the
enhancement, the improvement, for causes the movement to be more
reliable, at present when design generally does not recommend uses
this pattern product.
2 complete sets capacitors install arrangement way and
characteristic Outside 2.1 arranges Will form a complete set the condenser bank open-air
installment to outside, will have the construction construction work
load to be small, saves the project construction cost the merit.
At the same time, the equipment ventilates the radiation
condition in the movement to be better, the wind and the rain also
can carry on the natural flushing to the equipment. But
equipment outdoor environment influence bigger, especially along with
industry development, pollution degree day by day serious, the
equipment movement condition is worse, therefore set a higher request
to the equipment. Said on the present capacitor product quality,
only if the special local special environment, generally can satisfy. Outside at present installs the movement the capacitor complete
set installment in each place widespread use, greatly to 500 kV
transformer substation, slightly changes to the user, the movement
effect is all good. In 2.2 room arranges The capacitor installs Yu Shinei, the equipment not the
sleet dust attack, cannot have 闪络 the phenomenon, the movement is
safer. In some special outside areas if the equipment cannot
satisfy installs the condition, uses in the room to arrange. In the room the arrangement must consider the building and its
protects from fire 机械通风 and so on the question, this increased
the project construction cost without doubt. In my courtyard
design 220 kV transformer substation the shunted capacitor majority of
uses the bulk frame posture complete set installment which is in the
room arranges. 2.3 other Needs to propose is half open-air arrangement, it was
equal to the capacitor which installed for outside has built a visor
awning. All around builds approximately 1 m high fence in the
capacitor, the brick wall and the room is of use the wire netting to
obstruct encircles, roof prop on brick wall. Uses half open-air
arrangement, the equipment may exempt the summer sunlight is exploded
exposes to the sun, but simultaneously has lost the rain water nature
flushing condition, the equipment easy product dust, appears 闪络
the accident. Half open-air installment is suitable for the summer multi- high
temperatures, spring few sandstorm also contamination rank lower area,
like our country certain south areas. The Shijiazhuang bureau's
east temple 220 kV transformer substation uses is this kind of
arrangement pattern, has thrown since 1985 transports moves the
situation to be good. "Shunted capacitor Installment Design Standard" in 8.1.2
articles showing, after analyzes certain projects to use the question
which half open-air arrangement appears, obtains "this kind of
arrangement pattern not suitably uses in the design" the conclusion,
therefore, this arrangement method generally is at present not
selected in the design.
3 complete sets capacitors install shaping and arrangement 3.1 complete sets capacitors install shaping and
arrangement principle At present, the bulk frame posture shunted capacitor and
the crowded capacitor have the good movement achievement, the product
quality quite is all reliable, chooses what kind of pattern the
complete set installment besides to have to consider the transformer
substation the overall layout, but also must consider the user the
movement custom and the experience. The arrangement of equipment
way choice should rest on the equipment the performance, the
environmental condition. In order to control engineering
construction cost, so long as the equipment performance permission,
should first promote uses outside the room to arrange. When 3.2 choices and arrangement installment should pay
attention several questions 3.2.1 when capacitor for electric cable 进线, should
pay attention even if the low pressure generatrix side has established
the switch and the isolation knife switch, best establishes group of
single-pole earths again in the capacitor electric cable 进线side
the isolation knife switch, 中?the side also should establish a
single-pole earth knife switch. Before only when the electric
cable 进线and 中?the side establishment four-pole linkage
earth knife switch, overhauls the capacitor, power source side not
obvious cut-off point, moreover this time four-pole knife switch is
the closed position, does not conform to the movement overhaul
standard. 3.2.2 when the capacitor arrangement is leaving the low pressure
power distribution equipment farther also is high Presses the electric cable quantity to compare the
youth, if selects the method which straight buries, the high tension
cable puts on the long tube to be able to the construction to bring
the very major difficulty, this time may along the way make section of
high-voltages 缆沟, reduces the electric cable to put on the tube
the length, also may use puts on the way which the tube and straight
buries unifies. If the high tension cable quantity are more, may
make the high-voltage 缆沟 until the capacitor installment, but
should pay attention to the trench edge the gallery spacing to be
supposed not to be smaller than to the condenser bank outside 2 m.
According to the standard request, directs to the capacitor
equipment place electric cable, should use puts on the tube to lay,
埋管the corner radius should satisfiedly be bigger than 15 time of
caliber the requests. Two electric cables should not lay in the
high-pressured ditch, may alone make the ditch or use puts on the way
which the tube and straight buries unifies. 3.2.3 "Shunted capacitor Installment Design Standard" 9.1.7
stipulations that, Uses the collection suitable capacitor to be
supposed to establish the oil storage or to keep off the oil facility,
is stems from prevented when accident the insulating oil to all around
scatters, and causes the fire spread consideration. But
according to "Thermal power plant And Transformer substation Design
Fire protection Standard" 5.6.8 "outside the room the single oil mass
is above 1,000 kg electrical equipment should establish the oil
storage or keeps off the oil facility" the stipulation, considers the
crowded capacitor product quality in the design the enhancement and
many years movement experience, for reduced entire project
construction cost, when uses the entire seal structure product or the
oil mass is smaller than 1,000 kg half seal structure product, may
directly the arrangement of equipment in the cement foundation, but no
longer establishes 储油? Because after the entire seal
installment accident, the scene radically is unable to carry on hangs
the core and the insulating oil circulation filters and so on the
work, only can replace the new product or return the factory service. Outside 3.2.4 uses the complete set installment which installs,
when installment arrangement should consider the complete set
equipment is away from the question with other buildings and various
voltages rank power distribution equipment fire protection.
Outside the frame posture complete set installment arranges when
must consider the guard micro-organism attack occurs short-circuits
the accident, like the bird mouse class activity is frequent, should
when the complete set installment ordering, proposed like all around
and the crown establishes the lattice in the capacitor to encircle
blocks, the capacitor base to the place highly and so on the request,
as far as possible reduces the accident the occurrence. 3.2.5 in under the wiring form determination condition, the
equipment shaping and the arrangement often is close connected with
the transformer substation general arrangement, simultaneously
suitably considers the user the movement custom. Should act
according to the transformer substation the actual situation, the
synthesis considered the equipment the shaping and the arrangement,
causes to choose the equipment fully to display its characteristic,
achieves the movement security, the investment economy goal. |