> Along with the city modernization development,
the construction intellectualization, specially the public
construction intelligent system, has covered more and more many
contents, the construction intellectualization systems engineering
design starting point, should take construct as the platform disposes
various functional system, provides an investment reasonably for the
people, is highly effective, comfortably, the convenient environment
space, meets the current modern architecture need. The
modernized commercial building is changes into its main function goal
by the high intelligence, but the building automated system is modern
building intellectualization manifesting. The building equipment supervisory system will be a
collection control system which designs based on the modern control
theory in distributed control theory, it will distribute through the
central computer respectively is monitoring scene the intelligent unit
to connect in together, will constitute first then the consummation
synthesis supervisory system, will monitor to the entire building
electromechanical device realization centralism and controls,
guaranteed the equipment will move under the optimum condition, will
comfortably provide for the building comfortably, is highly effective,
the security, the energy conservation environment. Therefore,
not only the request building automation control system has the
reliability, meanwhile has openness, the flexibility, the efficiency. First, design foundation
Shenzhen match for in some building implementation
building automation plan synopsis as follows: Total floor space
50000m2, the construction highly is 90m, construction layer on 26,
underground 2, are a collection hotel, the work, the commerce, the
entertainment, the guesthouse is a body comprehensive
intellectualization construction. The construction
intellectualization system includes: Building automated system
(BA), safe guard system (SAS), synthesis wiring system (GCS), fire
auto-alarm system (FAS), vehicles import and export management system
management system, telephone communication system, public broadcast
system, wired television system (CATV), weak electricity power source
and earth system and so on. Second, various subsystems concrete design 1st, building automated system (BA) According to the American Honeywell Corporation
statistics, the large-scale modernized building BA system total
investment generally approximately composes about entire building
investment 1--2%. But after the BA system investment movement,
only needs in 2--4 the time then to take back this investment.
Because in BAS, through to the air-conditioning system
intellectualized management and the optimizing control and the
intelligent illumination control, can effectively save the energy,
thus brings the direct economic efficiency for the owner.
Because has realized the equipment automatic monitoring and the
management, may reduce the partial projects personnel and the
administrative personnel, saves the massive personnel expenditure for
the owner, also has overcome the manual control and management some
malpractices, may reduce some arise suddenly the accident the
occurrence and the equipment damage, brings the latent economic
efficiency for the owner. At the same time, because has realized
the air conditioning terminal temperature hypothesis control, may
enhance the environment to extend moderately, makes the building to
sharpen the competitive ability in the property market, brings the
indirect economic efficiency for the owner. 2nd, safe guard system (SAS) Uses the day network integration system, the
traditional television supervisory system, the security alarm system,
patrols systematically, the access management system management system
and so on each one independent system integration for the organic
whole, follows "the hardware linkage in the equipment disposition
primarily, software linkage for auxiliary" the principle, uses "the
disperser control in the movement, the centralized management" the
principle, increases the system the reliability. Entire
peacefully guards against the system to use the centralization
computer management, gives dual attention to the television monitoring
security, reports to the police, 门禁, patrols and so on the system
characteristic, realizes the building whole defense. Television monitoring: Passes in and out the channel
to the personnel, the parking lot, the great hall and the work level
channel, the elevator, realization picture monitoring and so on
elevator hall. important place, carries on the effective surveillance
and the record. The matrix control main engine uses the
well-known brand ADl68 matrix, has double CPU and the modular combined
type structure, and has considered the system expansion. Uses
the integration to insert the type hard disk videorecorder, has
overcome generally produces the black screen, dying machine based on
PC or the labor controlling machine hard disk video recording
opportunity and so on the stabilization. More importantly the
true duplex operation, meant regardless of the operator carries on any
operation, the video recording never can sever. Alarm system: The important region alarm may with
the television supervisory system linkage, the system dispose security
guard center computer control software, will report to the police a
position and the programming hypothesis electronic map carries on the
connection, will use in to report to the police and each kind of event
record. The electron patrols more systematic and 门禁 (access)
the management system management system: Carries on the control
to the building difference channel, to difference personnel's status
confirmation. The recording with reports to the police arise
suddenly the event to occur, and system and so on linkage CCTV.
For patrols using a networking 门禁 expansion selects, the
civil air defense and the technique guard against unifies. Visible to speaks the system: Visibly installs 1
pair in the important leadership office 1 to speak the system. 3rd, public broadcast system The public broadcast system divides into two parts
according to the function, one faces the public area, like great hall
exhibition hall, hotel concierge service region and so on public
system, usually carries on the background music broadcast, when the
fire or the emergency case may cut for urgently disperses the
broadcast; Two, face work conference region and garage region
broadcast system. The public broadcast system design mainly considers
following several factors: Namely the system way (generally
elects constant pressure), the division broadcast district, according
to the speaker characteristic determined the speaker and merit
putting, the urgent broadcast cut function, broadcasts the line and so
on. This building broadcast system division is 4 logical
districts (namely hotel, exhibition hall, garage and work), the
definite speaker and the merit putting principle is must consider the
speaker effect and acts according to its power to determine merit
putting, this building selects the modelling in the hotel concierge
service region and the office building spot to be good, the frequency
sound and the sound pressure refers to the elevation the 6W speaker,
selects the 10W bugle speaker in the garage, in the exhibition hall,
the report hall selects the 20W speaker. The public broadcast messenger call system should have the
twofold function, namely usual background music or ordinary broadcast
as well as urgent broadcast. Urgently broadcasts the master
switch to have the highest logical priority. This building
urgently broadcasts the master switch when has the fire prevention to
control the trigger pip arrives, through starts various districts the
logic control module the corresponding load return route to cut the
correspondence the urgent broadcast return route. When usually,
non- fire signal, various districts independent operation, cuts the
corresponding return route ordinary broadcasts the return route, but
works as when not ordinary broadcast control signal, then is at the
background music or the guest room sound condition. 4. The satellite accepts and the combined antenna
receiving system 1) each main room establishment television
combined antenna plug, can receive the satellite relay. 2) will establish the satellite receiving antenna and the
receiving system (for example Asia, Pan-America four) and brings into
line with the combined antenna system. 3) the international most immediate satellite information,
penetrates the building crown the receiving system, the immediate
transmission to each household television, the use and international
maintenance synchronization is in the lead. 5. Vehicles import and export management system
management system In the modern architecture, is more and more
important to the garage synthesis management. The building skirt
room basement is a garage, its underground garage synthesis management
system management system reads the card machine including the IC card,
the electrically operated parapet, the vehicles controller, the
dynamic computer monitor and so on, may complete the automatic charge,
the berth management, security reports to the police and so on the
function. 6. Structure wiring system As the intelligent construction foundation, the
structure wiring is one kind has the brand-new concept the wiring
system, with serves in the building all correspondences and the
computer equipment, will satisfy present and the future wiring
request. The building structure wiring divides into 4 subsystems
partially: (1) the work area subsystem are partial Through various floors distribuition box to floor
various information terminal. It is composed by the ultra five
kinds of 4 pair of twisted pair lines and the RJ45 terminal
receptacle. This part has the antijamming, is reliable and the
flexible good characteristic. (2) the skeleton line subsystem are partial Uses the multi- molds optical cable to connect the
building computer engine room and each level distribuition box (namely
main distribution frame and each assignment coil connection).
The multi- molds optical cable transmission speed may reach
above 500MBPS, has the enough band width, might remain for the next
wiring system development has the enough leeway. (3) manages the subsystem to be partial Is composed by each level distribuition box.
Considered various floors distribuition box information terminal
the maximum range does not surpass 100M, therefore establishes the
distribuition box in each (in box to install optical cable/twisted
pair line adapter, concentrator, twisted pair line jumps coil and so
on) (4) between equipment subsystem By is located in the computer engine room the
equipment and the host skeleton line and so on is composed. 7th, weak electricity power source and earth system The intelligent construction weak electricity
electrical power system must be reliable is stable and the non-
disturbance. Computer and the external instrumentation, the fire
fire panalarm as well as the communication equipment are a level of
current collectors load, uses the double power source terminal 自切
power supply. To terminal computer equipment disposition alone
UPS installment. In this building weak electricity project, the fire
auto-alarm system, the closed circuit television supervisory system
power source uses the double power source terminal 自切 power
supply. The double power source cuts the cabinet the power
source to come from the building to change the power distribution 2
transformers low pressure return route and 1 diesel electric engine
supplies. Building weak electricity project each system, all is
equipped with the independent power source distributing box control. The weak electricity system earth is a weak electricity
system important link. In order to reduce the disturbance and the protection
device, the weak electricity earth uses altogether uses the earth
system, the earth resistance not to be bigger than 1 ohm. 8th, wired television system (CATV) As the intelligent construction CATV system
design, to the system assurance user level, solves the weak field
intensity reception of TV problem, guaranteed the picture the
transmission quality as well as the program source should give the
full consideration. System front end equipment CATV main part,
it to signal processing quality quality direct influence overall
system quality, therefore front end the system input should have a
higher quality to satisfy the distribution system to need the level. Front end this building the equipment uses the enlargement
-- mixed style, its transmission system selects the assignment --
branch method, adapts the user terminal quantity to be many also the
distributed irregular characteristic. 9th, telephone communication system This building telephone communication system by
the commutation equipment, the transmission system, the terminal
device is composed. The building uses 600 program controlled
switches equipment, the telephone switchboard function is stronger.
The digital program controlled switch may according to the
different need realization multitudinous service function, like the
system function, the telephone traffic function and the extension
station function. The building telephone engine room is located in,
including transmits the equipment room, exchanges the engine room and
the telephone traffic room. The building telephone system brings into line with the
comprehensive wiring system, supposes two information plugs in each
office and the guest room, uses in the pronunciation, uses in the
data, may in the many kinds of equipment terminal plug insertion
standard information plug. 10th, computer network system The building computer network system is one of
most important infrastructures, it will correspond, An Bao, the fire
reports to the police, the electromechanical device automation, the
parking lot management, the estate management and the office
automation, the management information system small steelyard system
resources networking, realization intelligence building various
systems interlocking, will establish the intelligent building the
Intranet net, simultaneously might provide the computer network system
for the intelligent building various inhabitants to turn on the
service. It also may conveniently and outside the intelligent
building public data networking, the information network (for example
Internet and so on) interlocks, serves for each kind provides the
network support environment. The intelligent building computer network system design
contained the computer equipment, the network system has been soft,
the hardware and the security, whether were they the overall system
normal display biggest benefit physical foundation; It will
realize information sharing, will provide the enough information
circulation channel for the general computer user. The network
system uses the advanced Internet technology, the realization network
architecture is clear, the balanced network load. 11th, regards/the audio frequency selection and broadcast
system (VOD/AOD) In the present television program the audience is
passive. The program tenderer puts any program, the audience
only can look any program, the program time also is fixed invariable.
The video on demand system (Video /Audio on demand) is the use
high-speed computer network uses the video frequency data compression
and the class controls the technology to carry on the video frequency,
the sound, the data equisignal transmission, and carries on the
management through special-purpose video frequency processing
software, carries on the broadcast in the customer end multimedia
computer the modernized computer multimedia system, it may
simultaneously provide the video information to many users the
selection and broadcast service. For respectively lives the
customer through the building high-speed computer network
conveniently, a higher quality to provide service. At the same
time, this system 娱乐?also served for the building increment has
provided the foundation. This system by computer network LAN, WAN and if unites
into the net the server as well as the PC terminal is composed.
Mainly includes five parts: Media server PS (Program
Server), using server AS (Application Server), manages workstation MS
(Management Server), the customer end, the program manufactures the
end composition. Concluding remark Along with the intelligent construction fast
development, the construction integration management system management
system already more and more many melted into to people's daily life,
the design idea, the system function also unceasingly revised in the
application consummates, this plan in "according to had to integrate"
under the principle of design the system summarized in integration
management system management system each kind of connection to the
linkage, through to resources collection, analysis, transmission and
processing, thus carried on optimized to the entire building the
control and the decision-making, achieved highly effective, the
economical, the energy conservation, the coordination running status
and finally unified with the construction art, creates comfortably,
warm, the safe working conditions.
|